Ericsson Site Commissioning and Integration
Introduction
Course Summary
Course Objectives
Course Sections
LTE Provisioning Tool
LTE Provisioning Tool - Part 2
LTE Provisioning Tool - Part 3
LTE Provisioning Tool - Part 4
RFDS
Design Specification Document
Tools of a Technician - Results
Save Design to a PC
Element Manager
Cables
Ericsson Provided Serial Cables
LMT Splitter for DUS Only
Vehicle Inventory Checklist
Tools of a Technician - Summary
Get to Know Your Site
Understanding the RFDS Document
Equipment in the RFDS
RFDS Section 1 Review
Section 2 and Section 3 - Antenna Configurations
Section 5 – RAN Equipment
Section 6 – Antenna and Line Equipment
Information in the RFDS
Format and Content of the Design Document
Table of Contents
Find/Headings
Get to Know Your Site - Summary
Know How to Connect to Your Site
Getting Started
Properties
Download Element Manager Program
Run Element Manager Program
You’ve Got Connection
Prep Work
Prequisites
Basic Upgrade Package
Upgrade Folder
Terminal Emulator
Open FTP Client
Point to Remote Machine
Open Terminal Emulator
Open RBS Element Manager
RBS Element Manager - Navigate to Upgrade
Select New Upgrade
New Upgrade
Execute Upgrade Package
Upgrade Package Name
Close Element Manager
Navigate to Upgrade and Backup
Refresh The Upgrade and Backup Tree
Open DUL/S Provisioning Tool
Load the Market List
Select List All Market Scripts
Disconnect VPN
Select Site
Power Cycling the DUL/S
Create a CV or a DUL/S
Enter Required Information
Select CV Name
Show List of Available CVS
Prep Work - Summary
At the Site
Refer to the New RFDS
Connect to Your DUL/S
Look for DUL/S eNode B 1 OAM
Troubleshoot Ping Attempt
Login with NT Login
Common Errors
Verify Site Configuration
Verify Necessary Paperwork
3x6 HCS Connections
Stuff to do Before Starting Site Work
Setting PDU 02 02 Dip Switches
Post Integration Steps
Review Power Integration and Upgrade in MOPS
At the Site - Summary
Install Your Hardware
Is the Site Up to Code?
Install Your Hardware - Summary
Post Hardware Installation
702Cu-Cc Upgrade
Post-Upgrade
Pre-Upgrade
Post-Upgrade-continued
Additional SPDs
Post Hardware Installation - Summary
After Switch Ops Reviews the Site
Common Post Integration Alarms
Addressing Alarms
Verify DUL/DUS Alarms Using ALEX
Fault Management
HW Fault
Call Testing
Actions for Antenna Near Unit
Verify the DUL/DUS Alarms
After Switch Ops Reviews the Site - Summary
Replacing DUS/DU
Common Post Integration Alarms
Addressing Alarms On Site
Enclosure Product Data Mismatch Alarm
Input Data on Label
General HW Error Alarm
Channel Bandwidth Allocation Alarm
Common Post Integration Alarms - Summary
Call Testing
When Alarms Area Ready For Call Tests
Call Testing - Summary
Replacing DUS/DUL - Objectives
Replacing a DUL/DUS
CV Creation CLI Method - continued
CV Creation EMAS Method
CV Creation EMAS Method - continued_2
CV Creation EMAS Method - continued_3
CV Creation EMAS Method - continued_4
Copying CV to Laptop
Copying CV to Laptop - continued_1
Copying CV to Laptop - continued_2
Copy The License To Your Laptop - continued_1
Copy The License To Your Laptop - continued_2
Soft Lock a Sector/Site
Uninstall the Faulty DUL/S and Install the New One
Verifying Software Level of your CV
Verifying Software Level of your CV -continued
Load The CV to the New DU
Set CV as Startable - Then Activate Integration License
Load The License To The New DUL/S
Load The License To The New DUL/S - continued_1
Load The License To The New DUL/S - continued_2
Clear Password Alarm - Then Call Testing
Replacing DUS/DUL - Summary
Course Summary
Post Course Test
Links to slide format
Powered by
GitBook
Install Your Hardware - Summary
You can now:
Identify resources you can use to solve discrepancies between the RFDS and the site.
results matching "
"