Verify your site configuration using the RFDS provided by your manager or Site Development team.
Verify that the hardware is already present and on air.
Take the necessary precautions to prevent unnecessary outages (i.e. notify relevant parties of your site arrival (Switch, NOC, RF).
NEST the site and perform an inventory of your supplied hardware and parts.
Use the Site Design document for your specific configuration.
Design documents are located here:
Starting from Modernization up to AIR32 single band designs:
AIR32 dual Band and RRUS32 designs: