After loading the O&M script on your DUL/S what step should be taken next?

  1. Create a CV.
  2. Reload the site.
  3. Format the node.
  4. Load site specific scripts
  5. None of the above.

Once your finish loading your OAM script you should?

  1. Ping the site from SLIPED.
  2. Contact the switch to complete the integration.
  3. Connect port TN A to Port 7 on your router.
  4. Both 1 and 3.
  5. All of the above.

There is no connectivity to port 7 on the CSR from your DUL/S after running your O&M script the next steps are to?

  1. Verify your cabling from DU to port 7.
  2. Verify the CSR port is active.
  3. Both 1 and 2.
  4. Check cabling between DU and RU.
  5. None of the above.