After loading the O&M script on your DUL/S what step should be taken next?
- Create a CV.
- Reload the site.
- Format the node.
- Load site specific scripts
- None of the above.
Once your finish loading your OAM script you should?
- Ping the site from SLIPED.
- Contact the switch to complete the integration.
- Connect port TN A to Port 7 on your router.
- Both 1 and 3.
- All of the above.
There is no connectivity to port 7 on the CSR from your DUL/S after running your O&M script the next steps are to?
- Verify your cabling from DU to port 7.
- Verify the CSR port is active.
- Both 1 and 2.
- Check cabling between DU and RU.
- None of the above.