- Verify your site configuration using the RFDS provided by your manager or Site Development team.
- Verify that the hardware is already present and on air.
- Take the necessary precautions to prevent unnecessary outages (i.e. notify relevant parties of your site arrival (Switch, NOC, RF).
- NEST the site and perform an inventory of your supplied hardware and parts.
- Use the Site Design document for your specific configuration.
- Design documents are located here:
- Starting from Modernization up to AIR32 single band designs: http://tm/SiteDesigns
- AIR32 dual Band and RRUS32 designs: http://tm/SiteDesignsNew